loading

How Long Does a Bulk Clothing Order Take, and How Many Pieces Do Brands Order? We Counted 259 of Ours

We counted our 259 finished bulk orders. Typical due date: 20 days after ordering. Typical style: 159 pieces. See what makes an order faster or slower.

By Kenneth, owner of UNIT-100 · Figures read from our order system on November 10, 2026

New customers ask me the same two things before anything else. How long will it take? How many do I have to order? So I went into our order system and counted.

We are UNIT-100. My father opened our sewing factory in Zhongshan, China, in 2001. We make hoodies, T-shirts and sweatpants for clothing brands.

There are 259 finished bulk orders in there, all from 2026. The typical one was due 20 days after it was placed. The typical style was 159 pieces.

Our Order List

What we counted

What we countedResult
Finished bulk orders259
Styles in those orders374
Days from order to the due date we agreed (typical)20
Half of all styles were due in14 to 24 days
Pieces per style (typical)159
Styles of 100 pieces or fewer135 of 344
Styles of 1,000 pieces or more59 of 344

By “typical” I mean the one in the middle when you line them all up, the median. I didn't use the average. We have a few orders of 50,000 pieces, and they would drag the average somewhere no new brand will ever be.

The three totals differ because not every line in the system was filled in. There are 374 styles in all. 344 of them had a quantity. 332 had both an order date and a due date.

Lead Time

How long does a bulk order take?

About 20 days from the day you place the bulk order to the due date we agree. That is the middle of 332 styles. The quick quarter were due in 14 days or less. Three quarters were due by day 24.

I'm counting calendar days, weekends included. Twenty of those is about 14 working days. On our site we say bulk takes 7 to 20 working days after you approve the sample, so the count sits inside what we quote.

Shipping comes on top. To the US it is about 7 days by air and 20 by sea. Europe, about 10 by air and 40 by sea. Australia, about 10 by air and 25 by sea.

Here is a first order added up. Say it is a T-shirt with one print, going to the US by air. The sample takes about 10 days to make and about 7 to reach you. Bulk is about 20 days. Air freight is about 7. That comes to about 44 days, a little over six weeks, plus however long you take to approve the sample.

What the 20 days is not: it is the date we agreed with the customer. It is not a stopwatch on the day the boxes left. For most of these orders the system holds the due date and no ship date. What I do know is how we did against our dates over the past year: 90% of orders shipped within 2 or 3 days of the day we promised. Some of those were early and some were late.

Sewing line at the UNIT-100 factory in Zhongshan
Our sewing line in Zhongshan. The 20 days ends here, before shipping.
Two Real Orders

Why is one order 9 days and another 20?

The list doesn't record why. It does show the range. Here are two orders from it.

A tank top order: 200 pieces, black and white. Placed August 1, due August 10. Nine days.

A hoodie order: 300 pieces. Placed September 7, due September 27. Twenty days, the same as the typical order.

The part you control is approval. When we send you a print or embroidery sample, the paste or the thread is still sitting on the machine. Answer within a day and we carry on. Answer two days later and you lose more than two days. We have to set the machine up again, and that takes another two or three.

Order Size

How many pieces do brands order per style?

The typical style is 159 pieces. Out of 344 styles with a quantity in the system, 135 were 100 pieces or fewer. 59 were 1,000 or more. The other 150 landed somewhere between.

So about four styles in ten were small runs. Our minimum for full custom is 100 pieces per style and color, and you split the sizes inside that 100 however you want.

If you have talked to me, you may have heard me say a common order is 300 to 400 pieces. That is still right. Most orders have more than one style in them: 259 orders, 374 styles. Two styles at 159 each gets you to about 300. One order in March had two styles on it: 834 crew necks and 511 V-necks, both in gray and purple.

First Order

Should a new brand start with 100 pieces or 1,000?

Start at 100. I say this to every new customer: don't give me a big order at the start. Test me first.

One of our biggest customers did it that way. Their first order was 100 pieces. Today they order 1,000 a style.

I have also seen it go the other way. A customer in New York started with 1,000 pieces over 8 styles. The designs were good. But they didn't know how to sell on Instagram, and most of those clothes stayed in boxes. So make 100, sell them, and reorder what sold.

Fabric laid out on the cutting table in the UNIT-100 cutting room
The cutting room. We cut by the roll, which is why the roll sets your quantity.
Fabric Rolls

Why can't I order any number I like?

Because fabric comes on a roll, and we cut by the roll. A roll is about 25 kg. From one roll we get 22 to 25 hoodies.

If your number means we open a roll and only use part of it, the leftover is waste, and you pay for it in the unit price. So leave us a little room. Say a roll of your fabric makes 60 pieces. Then 120 is a better number than 100: two full rolls, nothing left over, and a lower price each. 100 is our minimum. It doesn't have to be your number.

Limits

What I couldn't count

The list doesn't say which orders were hoodies and which were tees. It shows our own style codes. So I can't give you 20 days for hoodies and some other number for T-shirts, not yet.

Sampling is not in the 20 days either. The clock starts when the bulk order is placed, and the sample comes before that.

And as I said above, these are due dates. Most of the older orders came into the system from spreadsheets, without the day they shipped.

FAQ

Frequently Asked Questions

How long does a bulk clothing order take?

On our 259 finished orders, the typical due date was 20 days after the bulk order was placed. Shipping is extra: about 7 days by air to the US, or about 20 by sea.

How many pieces do brands usually order?

The typical style on our list is 159 pieces. 135 of 344 styles were 100 pieces or fewer.

What does a 100-piece order cost?

At 100 pieces, a plain 235 GSM cotton T-shirt is $6.70 to $8.80 each. Hoodies are $13.50 to $27.30 each, depending on the weight and the style. Printing, embroidery, washes and labels are quoted on top. A sample is about $60 for a T-shirt with a one-color print and about $90 for a pullover hoodie.

Is 20 days a promise?

No. It is what was typical across 332 styles. Your date goes in your quote, once we have seen your fabric, your print and your quantity.

Can I order fewer than 100 pieces?

Not for full custom. That is 100 pieces per style and color. If you want fewer, we print on our stock blanks from 50 pieces, and you can mix colors and sizes.

Do the 20 days include the sample?

No. They start when you place the bulk order.

Send us the garment, the quantity and your date.

Send us a photo of the garment you want, how many, and the date you need them in your hands. We reply within 24 hours with a price and a due date.

Ask for a Price and a Date
Recommended for you
Get in Touch with Us
You Can Find Us Here 

Room 5/F-11,Block A Wantong International Square Liwan District,Guangzhou.

Contact Us

Contacts: Kenneth

Tel/WhatsApp: +852 6020 4527

E-mail: sales@unithundred.com

Founded in 2001, UNIT-100 is a custom clothing manufacturer, specializing in high-quality T-shirts, hoodies, and other knitwear.

Customer service
detect