By Kenneth, owner of UNIT-100 · Times as of November 2026
A first custom order of printed T-shirts, flown to the US, takes about six to seven weeks from the day we start your sample to the day the boxes arrive. A washed hoodie sent by sea takes nine to eleven weeks. A reorder of a style we have already made is much faster, and a print on our stock blanks is about three weeks.
Bulk is less than half of that. The sample, the couriers and your own approvals take the rest.
We are UNIT-100, a brand of Guangzhou Vision Clothing Co., Ltd. My father opened our sewing factory in Zhongshan, China, in 2001. We make hoodies, T-shirts and sweatpants for clothing brands, from 100 pieces per style and color. Our certificates and audit are on the about us page.
What are the stages, and how long is each?
Six stages. In three of them the garment is waiting: for a courier, for you, or for the freight.
| Stage | How long | What decides it |
|---|---|---|
| Price and questions | Within 24 hours | How clear your brief is |
| Sample | 3 to 18 days or more | Print, embroidery or a wash |
| Sample by courier | 7 to 10 days | Your country |
| Your approval | As fast as you answer | A day is best for a print or embroidery sample |
| Bulk | 7 to 20 working days, about 9 to 28 calendar days | 20 to 30 days with a wash or tie-dye |
| Shipping | 3 to 50 days | Air or sea, and where |
A photo and a quantity are enough to start the first stage. Send them here.
How long does the sample take?
From about 3 days for a plain garment to 18 days or more for one with a wash. It depends on how much is done to the garment after sewing.
| Sample | Days |
|---|---|
| Plain, no decoration | About 3 to 7 |
| With one print or one embroidery | About 10 |
| With print and embroidery | About 12 to 13 |
| Tie-dye | About 12 to 14 |
| With a garment wash | 14 to 18 or more |
The plain sample includes drafting the pattern.
Then it travels. By DHL or FedEx a sample reaches the US, Europe or Australia in about 7 to 10 days.
If the sample needs changes, a revised one takes about 7 to 10 days. For small changes I don't recommend a second round. We go straight to bulk and make a pre-production sample first, free of charge. You pay only its shipping.
A sample costs about $60 for a T-shirt with a one-color print and about $90 for a pullover hoodie. The rest of the costs are in what 100 hoodies or T-shirts cost.
How long does bulk take?
7 to 20 working days after you approve the sample and pay the deposit, which is 30–50%. In calendar days that is about 9 to 28.
On the 259 bulk orders we finished in 2026, the typical due date we agreed was 20 calendar days after the order was placed. Two from the list: a 200-piece tank top order placed August 1 was due August 10, and a 300-piece hoodie order placed September 7 was due September 27. The count is in how long a bulk order takes.
Washes are the exception. With an acid wash, a snow wash or tie-dye, plan 20 to 30 days for bulk.
Over the past year, 90% of our orders shipped within 2 or 3 days of the date we promised. Some were early and some were late.
How long does shipping take?
By air, 3 to 10 days. By sea, 15 to 50 days.
| To | By air | By sea |
|---|---|---|
| United States | About 7 days | About 20 days |
| Europe | About 10 days | About 40 days |
| Australia | About 10 days | About 25 days |
| Dubai and the Middle East | About 10 days | About 45 to 50 days |
| Japan | About 3 days | About 15 days |
These are today's times, November 2026. Sea freight to the Middle East is slower than usual at the moment.
The air times are with duties paid. That is how we usually ship. Without duties paid it is 2 to 3 days faster.
What does a whole order add up to?
Three orders, start to finish, in calendar days. Each sum uses our typical 20 days for bulk and assumes your labels are ordered early. Add the days you take to approve the sample.
100 printed T-shirts by air to the US. Sample about 10 days. Courier 7 to 10. Bulk about 20. Air freight about 7. That is 44 to 47 days, a little over six weeks.
100 washed hoodies by sea to the US. Sample 14 to 18 days. Courier 7 to 10. Bulk 20 to 30. Sea freight about 20. That is 61 to 78 days, nine to eleven weeks.
Our stock blanks with your print, by air to the US. No sample to sew and no fabric to cut. Plain blanks are ready about 7 days after the deposit. The print adds 5 or 6 days. Air freight is about 7. That is about 20 days.
Want the dates for your own order? Send us the garment and the quantity and we reply within 24 hours.
What slows an order down?
Four things, and you control the first two.
Late approvals. When we send you a print or embroidery sample, the paste or the thread is still on the machine. Answer within a day and we carry on. Answer two days later and you lose more than two days. We have to set the machine up again, and that takes another two or three.
Labels and packaging ordered late. Woven labels, hang tags and printed bags take about 10 days to make. Bulk counts from the day your labels are ready, so order them when you order the sample.
Washes. As above, a wash or tie-dye means 20 to 30 days of bulk.
Chinese New Year. In 2027 it falls on February 6, and the factory closes for about 15 days around it. Orders pause while we are shut. If your goods must arrive in February or March, ask us for the last order date when you ask for the price.
How do I make the next order faster?
Reorder the same style. We keep your pattern for good, so nothing has to be drafted or sampled again. A repeat of a style with every trim on file takes 15 to 20 days, plus shipping.
Or use stock blanks for the styles that don't need to be custom.
Frequently Asked Questions
When does the clock start on bulk?
When you approve the sample and pay the deposit, and your custom labels are ready.
Can I skip the sample to save time?
Not on a first order of a custom style. The sample is where you check the fit, the weight and the print before 100 pieces are made.
Do you answer on weekends?
Yes. Someone is on duty and replies within 3 hours of seeing your message. On weekday evenings you get a reply the next day.
Is sea freight worth the wait?
For heavy garments, often. 100 hoodies weigh about 100 kg, and air freight to the US is about $10 a kilo. If your launch date allows about two more weeks, ask us to quote both.
Get a price and a due date.
A photo of the garment, the quantity and the date you need it are enough. We reply within 24 hours with a price and a due date.
Ask for a price and a dateRelated: what 100 hoodies or T-shirts cost and why the minimum is 100 pieces.